Lithium Americas sets up to $1.6bn 2026 capex for Thacker Pass
Lithium Americas has guided capital expenditure of between $1.3 billion and $1.6 billion for 2026 as construction accelerates at its Thacker Pass lithium project in Nevada.The bulk of the spend – $1.2 billion to $1.5 billion – will be directed towards Phase 1 construction, with an...